FOR SURFACE PROTECTION 3/2017

In early October, FSP gave Oiltanking Finland’s raw turpentine container a new inner surface coating. The container is 16 metres high and its diameter is 11 metres. The demanding project was carried out in the Mussalo Container Terminal in Southern Finland, and the FSP project staff included Supervisor Karri Lempinen and surface treatment veterans Ari
TOP